Tel
86-21-58396228
2021 官網(wǎng)升級中!現(xiàn)在您訪問官網(wǎng)的瀏覽器設(shè)備分辨率寬度低于1280px請使用高分辨率寬度訪問。
Ship section 2 sand blasting rooms and 2 spray painting rooms, garage layout
The coating room is equipped with double-cylinder double-guns sandblasting system, sand suction system, abrasive recovery system, secondary dust removal system, spray paint system, paint mist purification system, dehumidified system, heating system, flexible door and central centralized control system
Dust emission concentration≤20 mg/m3, xylene emission concentration≤70 mg/m3, meets the national standard GB16297-1996 secondary standard
86-21-58396228
sales@guangchengcoating.com